This resettlement plan for the Renewable Energy Development Project, which installs wind-turbine generator units, requires compensation for land requisitioned whether temporarily or permanently, for farmland reclamation, for woodlands, and for crops and attachments; and finances inspection and evaluation, technical training for resettlement office staff, and disbursements for equipment, transportation, meetings, communication, and business tourism. The project will use measures to reduce the land needing to be occupied. Measures to reduce socio-economic impacts such as income production and quality of life include undertaking basic data collection to enhance internal and external monitoring to obtain feedback to expedite problems. During project construction, preference will be given to using local construction materials, local transportation, and local laborers, provided that the technical requirements are met so as to reduce the project's socio-economic impact.
Detalhes
-
Autor
Zhangjiakou Changcheng Wind Power Co., Ltd., China Inner Mongolia Electric Power Survey Design Institute, China
-
Data do documento
1998/10/01
-
TIpo de documento
Plano de reassentamento
-
No. do relatório
RP9
-
Nº do volume
2
-
Total Volume(s)
4
-
País
-
Região
-
Data de divulgação
2010/07/01
-
Nome do documento
Huitengxile Wind Farm - residents resettlement action plan
-
Palavras-chave
Administrative law;administration procedure;land acquisition;social and economic development;procedure for land acquisition;total number of people;township and village enterprise;resettlement action plan;land administration;average annual output;land use;resettlement of people;income of farmers;transfer of land;local building material;land acquisition fee;amount of land;land compensation;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.