This Resettlement Action Plan (RAP) for the Sao Paulo Integrated Urban Transport Project, covers mainly the reallocation impacts resulting from the construction of the subway's Yellow Line, segment Morumbi - Luz, which will link two important commercial areas: Pinheiros and Faria Lima, currently isolated by the natural barrier of the River Pinheiros. The RAP stipulates that although massive expropriations will be minimized, resettlement will occur, not only for project affected families (PAF), but also for local enterprises. Based on a survey conducted by the Companhia do Metropolitano de Sao Paulo (CMSP), to promote consultation with affected populations, the RAP assumes the following mitigating measures: resettlement will be minimized as possible, aiming at maintaining, or recovering living conditions, through either household, and enterprise reconstruction, or relocation as needed, to uphold community ties, and productive capacity. Compensation will be available for household, and enterprise losses, based on market values, to include moving expenses, while, income losses will be compensated for a period of one year following reallocation.
Detalhes
-
Autor
Companhia do Metropolitano de Sao Paulo (CMSP)
-
Data do documento
2000/02/01
-
TIpo de documento
Plano de reassentamento
-
No. do relatório
RP72
-
Nº do volume
3
-
Total Volume(s)
4
-
País
-
Região
-
Data de divulgação
2010/07/01
-
Nome do documento
Anexos 2-9 : linha 4 Amarela : trecho Morumbi - Luz
-
Palavras-chave
Resettlement; Replacement costs; Households; Enterprises; Market value; Compensation; Consultation with members; Household surveys
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.