Detalhes
-
Data do documento
2013/05/13
-
TIpo de documento
Folhas de Dados Integradas sobre Salvaguardas
-
No. do relatório
AC6920
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2013/05/13
-
Disclosure Status
Disclosed
-
Nome do documento
Honduras - Rural Infrastructure Project (AF)
-
Palavras-chave
Public Expenditure, Financial Management and Procurement;water and sanitation system;project design and implementation;Environmental and Social Impact;rural services and infrastructure;Safeguard Policies;safeguard policy;safety of dam;infrastructure service provision;construction and rehabilitation;improvement of road;electricity generation systems;local capacity building;land use change;Solid Waste Management;energy and water;conservation of water;water quality monitoring;delegation of responsibility;transmission and distribution;response to crisis;critical natural habitats;Broad Community Support;environmental education material;national environmental legislation;social communication;grievance mechanism;protected area;irreversible impacts;safeguard issue;national legislation;compensation measures;involuntary resettlement;road improvement;indigenous communities;environmental permit;social safeguard;environmental training;solar system;treatment plant;community engagement;cultural property;community meetings;indigenous community;private land;environmental study;access road;community level;solar panel;water user;rural community;infrastructure action;community participation;internal capacity;environmental issue;environmental instruments;electrical lines;road transportation;pasture land;commercial harvest;local committees;full participation;environmental consultant;mitigation measure;resettlement plan;project finance;community consultation;certification system;public place;local ngo;institutional responsibilities;vulnerable people;environmental specialist;municipal program;electricity connection;safeguard analysis;selection criterion;direct beneficiaries;grid extension;civil works;participatory local;physical characteristic;road maintenance;physical resettlement;community building;international waterway;Rural Poor;operations manual;photovoltaic system;participatory planning;land acquisition;local legislation;infrastructure challenge;safeguards compliance;consulting service;Consulting services;project execution;government administration;electricity access;environmental capacity;water source;environmental supervision;water system;environmental license;water tank;environmental risk;environmental review;environmental audit;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.