This environmental assessment for the Hanoi Urban Transport and Development Project, which finances physical works as well as improves and upgrades relevant management systems, describes expected environmental impacts and proposes measures to mitigate them. It suggests setting an acoustic barrier and double-layering the sound-insulated windows and using asphalt as the surface material to control noise and vibrations; controlling traffic and vehicle emissions by reducing the number of vehicles and distancing buildings from the roads; treating industrial sewage using an oil-separating treatment and draining domestic sewage into the municipal sewage pipeline after being treated in cesspools; protecting the trees and the greenbelt area to maintain the aesthetics of the landscape; spraying water to reduce air-borne dust and other emissions; storing construction material and compacting where possible; banning of construction material at sites; washing trucks to clean off dirt before they travel off-site; and notifying cultural authorities of chance archeological finds upon discovery.
Detalhes
-
Autor
MVA Asia Limited
-
Data do documento
2006/10/01
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E1400
-
Nº do volume
4
-
Total Volume(s)
6
-
País
-
Região
-
Data de divulgação
2006/11/27
-
Disclosure Status
Disclosed
-
Nome do documento
EIA report for the project of CT1 and CT6 settlement sites
-
Palavras-chave
Policy and human Resource Development;transportation engineering;law on environment protection;Natural Resources and Environment;waste water;implementation of law;land use;rain water;water supply system;average relative humidity;amount of fund;garbage collection system;case of emergency;electric supply system;annual solar radiation;construction and operation;water pump;source capital;average wind speed;environment impact assessment;annual average rainfall;water supply pipe;air pollution control;water pollution control;water supply line;joint venture company;water level;water reservoir;construction area;flower garden;resettlement sites;land area;detailed planning;dry season;high-rise building;traffic system;Public Transportation;urban centre;construction site;average temperature;main road;drainage system;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.