Skip to Main Navigation

Yugoslavia - Kikinda Iron Foundry Expansion Project (Inglês)

The project includes: (a) Expansion and modernization of the malleable foundry, including two hot blast cupolas, four electric induction furnaces, two flaskless molding lines, one automatic molding line, two annealing furnaces and supporting facilities; (b) Expansion of the gray and nodular foundry, with four electric furnaces, one automatic molding line, one annealing furnace, and core-making facilities, one heat treatment plant, one sand preparation plant and supporting facilities; (c) Expansion and modernization of the fitting finishing shop, including thirteen automatic machines, six lathes, one new galvanizing plant, one additional packing unit and supporting facilities; (d) Expansion and modernization of the machine tool plant including relocation of existing machines, replacement of old machines, addition of numerically-controlled machines and a climatized mounting room; (e) A new streamlined storage and materials handling system; (f) Expansion and modernization of the existing facilities for the distribution of electric power, gas, compressed air and water and the installation of one new gas-heated steam boiler; (g) Construction of a railroad connection to the public railroad system; and (h) Installation of equipment for dust and fume extraction.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.