Nome do documento
Indonesia - Power Distribution Development
-
Palavras-chave
Supervisory Control and Data Acquisition; access to modern energy service; energy development policy; access to electricity service; reliability of electricity services; no access to electricity; power transmission and distribution; Advisory services; distribution line; efficiency of electricity; reliability of supply; notification of award; distribution transformer capacity; capacity building support; per capita consumption; capacity building objective; Full Environmental Assessment; high risk activities; power generation capacity; independent power producer; data on performance; low carbon development; million people; power system expansion; expansion of capacity; renewable energy generation; planning and design; Linked to Disbursement; achievement of outcome; theory of change; fast decision-making process; distribution network; network planning; Energy Sector; power consumption; Indigenous Peoples; operational management; distribution investment; social screening; power utility; power utilities; transmission line; operational efficiency; outcome targets; distribution loss; capital expenditure; program objectives; program outcome; organizational structure; mitigation measure; active partner; standard practice; power supply; technical expertise; sustainable energy; energy infrastructure; entry rate; fiduciary risk; personnel management; geographical area; distribution activity; household consumers; contract management; disbursement rate; investment planning; delivery service; procurement audit; intermediate indicator; distribution capacity; output targets; achievement level; loss reduction; project costing; outcome indicator; tariff level; electricity sector; revenue model; electricity sale; program performance; financial stabilization; electricity system; increased access; Fiduciary procedure; causal link; energy planning; national strategy; electricity access; grid extension; proactive engagement; capacity constraint; program effectiveness; parallel financing; land acquisition; income growth; household connection; polychlorinated biphenyl; social aspect; social impact; internal control; funds flow; internal auditor; financial reporting; capacity assessment; Program of Activities; corrective action; budget planning; inclusive development; investment finance; results framework; investment lending; government's vision; national electrification; measurable results; generating capacity; institutional impact; distribution component; institutional strengthening; verification system; physical inspection; program results; national gdp; expansion plan; medium voltage; internal monitoring
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.