The development objective of the Emergency Crisis Response Project for Yemen is to provide short-term employment and access to selected basic services to the most vulnerable; preserve existing implementation capacity of service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response to the food crisis. Some of the negative impacts and mitigation measures include: (1) use dust control measures onsite, such as water spraying for dust suppression; (2) cover lorries transporting friable construction materials and spoil; (3) provide adequate protective wear for workers, and equipment must be maintained regularly to avoid any emissions; (4) regular inspection and examinations for impacts and address them through maintenance replacement of materials spoiled; (5) for handling and occupational health applying strict protection regulation for occupational health measurements is critical and a site-specific management plan is required-including all operational stages from handling, washing, classification, freezing, backing up to loading and distribution to consumption; (6) maintain records and procedures for equipment maintenance, handling, and storage of liquid fuels and chemicals; lab regular testing for ground and surface water; (7) encourage drying mechanisms to avoid stagnant water; (8) frequently inspect the cistern for leakage and the houses for expected damages from leakages; and (9) avoid creating congested and unsafe road conditions at intersections, and in villages and towns.
Detalhes
-
Autor
Yemen
-
Data do documento
2010/05/01
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
SFG5353
-
Nº do volume
7
-
Total Volume(s)
9
-
País
Yemen, Iêmen República do
-
Região
-
Data de divulgação
2019/04/01
-
Disclosure Status
Disclosed
-
Nome do documento
الصندوق الاجتماعي للتنمیة دلیل العملیات : الملحق 10
-
Palavras-chave
Small and Micro Enterprise Development Unit; rights of children with disability; Quality and Cost Based Selection; access to primary health care; independent board; social and economic development; monitoring and evaluation tool; access to basic service; Environmental and Social Safeguard; decentralization of education service; subproject cycle; procurement of consultant; agriculture and livestock; human resource development; water and environment; social capital development; national development plan; creating job opportunity; sustainable microfinance institution; intangible cultural heritage; amount of loan; income generating activity; termination of contract; internal control system; level of performance; chart of account; access to water; women at risk; Environmental Management Plan; gross domestic product; road maintenance fund; world health organization; number of beneficiaries; local government body; bottom up planning; rural area; adverse environmental impact; internal audit system; allocation of fund; information for development; source of income; integration of woman; flood protection work; traditional irrigation systems; high value crops; cost of transportation; capacity of community; semi skilled labor; quality and quantity; source income; income generating opportunity; micro finance industry; maintenance of infrastructure; public investment program; access to infrastructure; per capita cost; student per classroom; degree of poverty; cash accounting basis; sources of fund; Solid Waste Management; effective decision making; choice of technology; council of minister; quality of education; basic water need; national water strategy; rooftop rainwater harvesting; human resource management; health service coverage; improving learning environment; reproductive health service; mental health care; person with disability; education for child; education child; poor community; invitation to bid; alleviation of poverty
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.