Skip to Main Navigation

Afghanistan - On-Farm Water Management Project : restructuring (Inglês)

The objective of the On-Farm Water Management Project for Afghanistan is to improve agricultural productivity in project areas by enhancing the efficiency of water used. This restructuring paper seeks the approval of the Afghanistan Country Director and the Administrator of the Afghanistan Reconstruction Trust Fund to introduce the following changes to project. The overall implementation of the project has been delayed significantly resulting in extremely poor utilization of grant funds. In order to improve the disbursement profile and to bring the project to a satisfactory closure by its current Grant closing date of June 30 2014, the Mid-Term Review Mission carried out in February 2013 has recommended restructuring of the project to scale down the activities with a cancellation of US$ 16 million from the original Grant amount of US$ 41 million. After consultation with the recipient, it was decided that the $16 million will no longer be required for the project as the activities originally envisaged under the Project would not be finalized before closing date. Accordingly, this restructuring involves the scaling down of the size of the physical infrastructure investments to a level that can be reasonably expected to be completed by the grant closing date. The revised target for command area serviced by on-farm infrastructure modernization will be 10,000 ha as opposed to the original target of 52,500 ha. In addition, as recommended by the MTR mission, the grant agreement will be modified to include the construction of five office buildings for the Ministry of Agriculture, Irrigation and Livestock (MAIL) to accommodate the Irrigation Directorate and on-farm water management staff at the five regional centers of Kabul, Herat, Mazar-e-Sharif, Baghlan and Jalalabad.

Detalhes

  • Data do documento

    2013/04/01

  • TIpo de documento

    Documento do projeto

  • No. do relatório

    77375

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Afeganistão,

  • Região

    Sul da Ásia,

  • Data de divulgação

    2013/10/03

  • Disclosure Status

    Disclosed

  • Nome do documento

    Afghanistan - On-Farm Water Management Project : restructuring

  • Palavras-chave

    Institutional Strengthening and Capacity Building;on-farm water management;base price;short period of time;monitoring and evaluation result;Operational Core Curriculum;economic and financial analysis;cost component;farm gate price;irrigation water users;water to farmer;contract award process;physical cultural resources;costs of rehabilitation;net present value;costs of investment;safety of dam;increase in land;crop yield increase;data collection forms;department of agriculture;cash flow analysis;invitation to bid;operations and maintenance;adaptation of technology;investment cost;wheat yield;physical infrastructure;outcome indicator;wheat price;farm level;improved water;irrigation infrastructure;irrigated area;financing plan;Financing plans;demonstration site;sensitivity analysis;agricultural productivity;discount rate;land leveling;sunk cost;Environmental Assessment;Safeguard Policies;safeguard policy;civil works;conservative assumption;horizontal axis;crop season;secondary canal;internal monitoring;baseline survey;conveyance efficiency;selection criterion;community contribution;financial return;Indicator Baseline;International Water;on-farm irrigation;involuntary resettlement;indigenous people;measure of use;cereal crop;disbursement profile;Indigenous Peoples;local contractor;intermediate outcome;infrastructure work;survey data;grain market;bank guarantee;primary reason;financial allocation;short course;investment target;natural habitat;emergency irrigation;Irrigated Agriculture;lessons learnt;participatory monitoring;value use;water delivery;data quality;local condition;water saving;land productivity;focused training;corrective action;project intervention;effective performance;monthly reports;dominant crop;monitoring indicator;water loss;irrigation improvement;rehabilitation scheme;procurement data;financial disbursement;Project Monitoring;cost-benefit analysis;cubic metre;water productivity;rice cultivation;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.