Skip to Main Navigation

Tunisia - Tunis West Sewerage (Phase 1) Project (Inglês)

Detalhes

  • Data do documento

    2006/05/27

  • TIpo de documento

    Folhas de Dados Integradas sobre Salvaguardas

  • No. do relatório

    AC2359

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Tunísia,

  • Região

    Oriente Médio e Norte da África,

  • Data de divulgação

    2006/05/30

  • Disclosure Status

    Disclosed

  • Nome do documento

    Tunisia - Tunis West Sewerage (Phase 1) Project

  • Palavras-chave

    financial and private sector development;Environmental and Social Impact;legal and regulatory framework;treated wastewater;safeguard policy;Safeguard Policies;wastewater treatment facility;acquisition of land;wastewater treatment plant;duplication of efforts;adverse social impact;construction and operation;safety of dam;rights of way;condition of effectiveness;national water supply;adverse environmental impact;biological treatment system;social and environmental;Environmental Management Plan;water and wastewater;mitigation measure;site selection;sewerage component;civil works;water bodies;public consultation;sludge disposal;private land;groundwater table;pumping station;water resource;Country Systems;interest group;Environmental Assessment;institutional strengthening;land acquisition;sewerage network;project costing;mitigation actions;public place;professional institution;site visits;resettlement issue;institutional responsibilities;resettlement plan;public concern;land size;lease contract;voluntary basis;project execution;Cultural Heritage;land use;potential demand;local ngo;legal capacity;wastewater reuse;cost-benefit analysis;construction supervision;ensuring compliance;water quality;appraisal mission;wastewater discharge;emergency equipment;anaerobic digestion;filter press;dry solids;international standard;land plot;sewerage line;agricultural land;contractual provision;safeguard issue;irreversible impacts;baseline conditions;effluent quality;acceptable quality;treated effluent;private property;treatment facilities;minimum level;emergency treatment;plant performance;regular monitoring;raw sewage;institutional building;physical characteristic;safeguard analysis;natural habitat;Indigenous Peoples;project datum;investment loan;environmental health;Sanitation Services;international tourism;coastal area;international waterway;water scarcity;operational management;secondary treatment;treated sewage;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.