Burundi - Second Social Action Project : Burundi - Deuxieme project d'actions sociales (Francês)

Ratings for the Second Social Action Project in Burundi were as follows: outcomes were satisfactory, the risk to development outcome was substantial, the Bank performance was satisfactory, and the borrower performance was satisfactory. Lessons learned included: (a) community participation can ensure ownership by the communities of the whole approach and process, including community mobilization and the selection of sub-projects, the monitoring of construction and the subsequent operation and maintenance of infrastructure; (b) in an emergency and civil conflict context, there is a need for simplicity of project design for delivering urgently needed support quickly, taking into account the limited local capacity for project execution; (c) during a civil conflict, it is essential for the implementing agency to maintain good relations with all stakeholders in order to implement sub-projects; (d) in a post conflict phase, there is the potential to work with local governments, if these are established; (e) a social fund can mobilize communities to work with the formal health and education structures to supply social services, rather than limit itself to bricks and mortar; (f) The use of qualified NGOs and other entities to work as Agences d'Encadrement has enabled Twitezimbere to carry out the community mobilization in almost the whole country in a relatively short period of time; (g) early child development activities can be undertaken in rural areas at a low cost provided that implementation arrangements are based on community participation and emphasize proximity aspects; (h) the design of a monitoring component for a social fund project will ensure that only competent organizations are recruited for implementation; (i) subcontracting was a challenge due to limited NGO capacity and administrative requirements; (j) The Bank should have taken early action to design proper indicator to monitor poverty; and (k) This type of project may be a key contributor to improved development outcomes s in a difficult situation.

Detalhes

  • Data do documento

    2006/09/14

  • TIpo de documento

    Conclusão da Implementação e Relatórios sobre Resultados

  • No. do relatório

    ICR45

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Burundi,

  • Região

    África,

  • Data de divulgação

    2010/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Burundi - Deuxieme project d'actions sociales

  • Palavras-chave

    ,,

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.