Detalhes
-
Data do documento
2001/07/09
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR10953
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/28
-
Disclosure Status
Disclosed
-
Nome do documento
Pakistan - Private Sector Energy Development
-
Palavras-chave
Water and Power Development Authority;fiscal base;mining and other extractive;combined cycle power plant;project costing;private sector transactions;interest during construction;balance of payment;Oil and Gas;letter of intent;private power generation;Oil & Gas;lack of incentive;choice of technology;lack of agreement;demand for electricity;lack of transparency;mutually acceptable solution;foreign exchange exposure;suspension of disbursement;depth of analysis;allegations of corruption;risk of corruption;power purchase agreement;source of revenue;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.