Skip to Main Navigation

Brazil - Belo Horizonte Urban Upgrading and Inclusion Project : Resettlement framework paper : executive summary (Inglês)

This resettlement framework: executive summary has been prepared for the Vila São José and the Taquaril components, for which Involuntary Displacement and Resettlement Plans (PDRI) will be prepared during the first year of project implementation together with the detailed engineering designs for respective interventions. A number of the interventions have yet to have their preliminary engineering design undertaken for the Taquaril settlement, and the existing preliminary designs for Vila São José will be revised over the coming months. To mitigate the effects on displaced and project affected people (PAP) the following compensation objectives will be included in the preparation of the Resettlement Action Plan: Homes will be built to resettle families to be displaced from both settlements; homes will be offered in other districts or neighborhoods; minimize the number of properties to be vacated; ensure living conditions are maintained or improved; maintain the same level of productivity activity; ensure availability of social services, such as, education, health care, public transport, etc.; continuously seek to minimize social and environmental impacts on the population; negotiations for resettlement will only take place when all options are available; finally, provide free legal and social assistance to people to be resettled.

Detalhes

  • Data do documento

    2005/02/01

  • TIpo de documento

    Plano de reassentamento

  • No. do relatório

    RP300

  • Nº do volume

    1

  • Total Volume(s)

    2

  • País

    Brasil,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2010/07/01

  • Nome do documento

    Resettlement framework paper : executive summary

  • Palavras-chave

    land tenure regularization;integrated management;housing estate;social service provision;high population density;public transportation system;Solid Waste Management;Survey of Living Conditions;number of workers;loss of earnings;detailed engineering design;minimum consumption level;water and electricity;living standard;productive activity;community participation;resettlement activities;affected population;construction work;shanty town;geological risk;unhealthy condition;complementary activities;physical barrier;local access;family head;low-income community;high school;family living;social inclusion;socio-economic development;land bank;social work;Town Planning;land administration;Social Sciences;socioeconomic development;local conflict;support network;resettlement process;social communication;working day;vulnerable group;resettlement plan;legal assistance;young parent;institutional responsibilities;social monitoring;local relation;g 7;effective procedures;legal ground;resettlement area;resettlement cost;purchase transaction;construction permit;population resettlement;involuntary resettlement;environmental conservation;recreational activity;land division;greater access;Housing Complex;environmental rehabilitation;housing systems;steep slope;wastewater collection;road link;housing condition;stream course;excreta-related diseases;traffic condition;capacity strengthening;urban operation;environmental condition;quality of house;illegal settlement;road access;urban network;environmental degradation;wastewater management;basic requirement;social vulnerability;program objectives;positive impact;social environment;urban upgrade;community mobilization;urban vulnerability;metropolitan region;social infrastructure;low-income housing;Public Services;social fabric;cash compensation;municipal decree;corrective measure;public fund;Parking Lot;water consumption;municipal public;social interest;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.