Integrated Safeguards Data Sheet (Appraisal Stage) - Kariba Dam Rehabilitation Project - P146515 (Inglês)

Detalhes

  • Autor

    Wishart,Marcus J.

  • Data do documento

    2014/11/08

  • TIpo de documento

    Folhas de Dados Integradas sobre Salvaguardas

  • No. do relatório

    ISDSA1043

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    África,

    Zâmbia,

    Zambia & Zimbabwe,

  • Região

    África,

  • Nome do documento

    Integrated Safeguards Data Sheet (Appraisal Stage) - Kariba Dam Rehabilitation Project - P146515

  • Palavras-chave

    Independent Panel of Experts;Environmental and Social Management Plan;Environmental and Social Impact Assessment;safeguard policy;Safeguard Policies;Environmental and Social Safeguard;accepted international standard;dam safety standards;safety and reliability;involuntary resettlement;natural disaster management;safety of worker;accordance with provision;dispute adjudication;dam break;response to crisis;reservoir operation procedure;Water Resource Management;power generation capacity;environmental management department;dam safety assessment;quantity of water;critical natural habitats;adverse environmental impact;drainage basin area;supply and installation;adverse social impact;transparent manner;consultative process;consulting service;dam foundations;Consulting services;large flood;project costing;water flow;land acquisition;catastrophic failure;public consultation;rehabilitation component;existing dam;civil works;safeguard issue;construction phase;community relation;government response;tender process;long-term impact;cultural property;safeguards data;resettlement plan;financing agreement;public awareness;social requirement;notification requirement;local ngo;dam wall;downstream areas;consistent messages;routine monitoring;construction waste;noise pollution;instream flow;flood water;safe passage;individual activity;excavation work;soil erosion;access road;power production;power station;natural forest;construction impact;significant loss;downstream face;riparian state;stakeholder engagement;bilateral relationship;communication strategy;site visits;discharge capacity;reservoir level;engineering study;socio-economic status;financial aspect;water level;project datum;flood protection;transparent mechanism;safeguard analysis;physical characteristic;satisfactory manner;water use;irreversible impacts;construction site;access route;waste dumps;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.