Detalhes
-
Autor
-
Data do documento
2014/11/08
-
TIpo de documento
Folhas de Dados Integradas sobre Salvaguardas
-
No. do relatório
ISDSA1043
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Nome do documento
Integrated Safeguards Data Sheet (Appraisal Stage) - Kariba Dam Rehabilitation Project - P146515
-
Palavras-chave
Independent Panel of Experts;Environmental and Social Management Plan;Environmental and Social Impact Assessment;safeguard policy;Safeguard Policies;Environmental and Social Safeguard;accepted international standard;dam safety standards;safety and reliability;involuntary resettlement;natural disaster management;safety of worker;accordance with provision;dispute adjudication;dam break;response to crisis;reservoir operation procedure;Water Resource Management;power generation capacity;environmental management department;dam safety assessment;quantity of water;critical natural habitats;adverse environmental impact;drainage basin area;supply and installation;adverse social impact;transparent manner;consultative process;consulting service;dam foundations;Consulting services;large flood;project costing;water flow;land acquisition;catastrophic failure;public consultation;rehabilitation component;existing dam;civil works;safeguard issue;construction phase;community relation;government response;tender process;long-term impact;cultural property;safeguards data;resettlement plan;financing agreement;public awareness;social requirement;notification requirement;local ngo;dam wall;downstream areas;consistent messages;routine monitoring;construction waste;noise pollution;instream flow;flood water;safe passage;individual activity;excavation work;soil erosion;access road;power production;power station;natural forest;construction impact;significant loss;downstream face;riparian state;stakeholder engagement;bilateral relationship;communication strategy;site visits;discharge capacity;reservoir level;engineering study;socio-economic status;financial aspect;water level;project datum;flood protection;transparent mechanism;safeguard analysis;physical characteristic;satisfactory manner;water use;irreversible impacts;construction site;access route;waste dumps;
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.