Detalhes
-
Autor
-
Data do documento
2019/12/05
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR38033
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2019/12/05
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - BD Chittagong Water Supply Improvement and Sanitation Project - P103999 - Sequence No : 18
-
Palavras-chave
access to safe water; people in urban area; water supply improvement; preparatory work; water treatment plant; number of water; Investment Project Financing; capacity development activity; permit water; standard operating procedure; investment planning; household water; risk category; distribution network; operational structure; operation risk; transmission line; bill collection; other water; physical work; water global; household connection; project intervention; water utilities; water utility; sustainable access; improved sanitation; drainage infrastructure; operational management; water sale; transmission main
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.