Skip to Main Navigation

Kenya - North Eastern Transport Improvement Project : Environmental Assessment : Environmental and Social Impact Assessment for Upgrading to Bitumen Standards of Isiolo - Modogashe Road Section 190 km (A10-B84) (Inglês)

The development objectives of the North Eastern Transport Improvement Project for Kenya are to improve the movement of goods and people along the Isiolo-Wajir section of the Isiolo-Garissa- Wajir- Mandera- Mogadishu road corridor and to enhance internet connectivity between Northeastern and the rest of Kenya. Some of the negative impacts and mitigation measures include: (1) provide and implement a traffic management plan; (2) employee awareness on company procedures for dealing with spills and leaks from oil storage tanks; (3) provision of adequate drainage facilities to channel water from one side of the road to the other; (4) manual removal of the invasive species such as the Prosopis Juliflora (Mathenge) at material and work sites to prevent proliferation; (5) proper solid and liquid wastes disposal mainly from the construction camps, sites, and offices; (6) hiring unskilled construction and skilled (if available) labor from the local population as far as possible; (7) avoiding night time construction when noise is loudest near residential areas or areas near wildlife; (8) ensure that all construction machines and equipment are in good working conditions and to manufacturer’s specifications to prevent occupational hazards; and (9) ensuring than each employee signs a code of conduct that covers child protection. Ensuring no children are employed on site in accordance with national labor laws.

Detalhes

  • Autor

    Endo,Kenya

  • Data do documento

    2019/11/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    SFG5908

  • Nº do volume

    1

  • Total Volume(s)

    2

  • País

    Quênia,

  • Região

    África,

  • Data de divulgação

    2019/11/28

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental and Social Impact Assessment for Upgrading to Bitumen Standards of Isiolo - Modogashe Road Section 190 km (A10-B84)

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.