Detalhes
-
Autor
-
Data do documento
2020/12/22
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR44875
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/12/22
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - CO Rio Bogota Environmental Recuperation and Flood Control Project - P111479 - Sequence No : 20
-
Palavras-chave
integrated water resources management; flood control work; flood control protection; Investment Project Financing; treatment plant; environmental restoration; civil works; environmental asset; effluent discharge; result indicator; disbursement ratio; water utility; public source; operation risk; risk category; basin committee; water global; metropolitan area; hydrological model; sanitary measure; flood risk; construction work; power line; water utilities; metropolitan region; under contract; return period; water quality
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.