Detalhes
-
Autor
-
Data do documento
2020/11/20
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR44232
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/11/20
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - The Power Recovery Project - P144029 - Sequence No : 12
-
Palavras-chave
financial statement; power sector reform; annual consumption; number of meters; Investment Project Financing; risk management mechanism; land acquisition process; power sector entity; citizen engagement; hydrological risk; distribution loss; distribution company; data center; distribution network; distribution infrastructure; power utility; power utilities; feeder line; monthly revenue; market base; severe drought; energy purchase; transmission fee; other development; market liberalization; Electricity Market; medium voltage; qualified supplier; cable laying; good cooperation; construction permit; direct communication; electric cable; sewage pipe; power supply; financial viability; access road; operation risk; risk category; account receivable; holding company; distribution function; downstream activity; billing system; downstream activities; financial datum
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.