Detalhes
-
Data do documento
2011/04/07
-
TIpo de documento
Documento de informações do projeto
-
No. do relatório
AB6519
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2011/04/29
-
Disclosure Status
Disclosed
-
Nome do documento
Nepal - First Phase of the Modernization of Rani Jamara Kulariya Irrigation Scheme Project
-
Palavras-chave
national water plan;management of irrigation system;irrigation and water resources;gross domestic product;managed irrigation system;agriculture and irrigation;irrigation and drainage;incidence of poverty;irrigation service fee;water user;water use efficiency;canal bank protection;construction of bridges;ethnic minority groups;water user association;high value crops;traditional irrigation systems;intake of water;Financial Management Unit;improved living standard;income from agriculture;reliability of supply;large irrigation system;Integrated Pest Management;rural labor force;department of agriculture;national poverty rate;diversion of water;local resource mobilization;sense of ownership;irrigation water delivery;improved agricultural technologies;main canal system;farmer;irrigation infrastructure;irrigation scheme;monsoon season;real gdp;tertiary canal;land holding;improved seed;agricultural sector;safeguard policy;Safeguard Policies;agricultural input;Environmental Assessment;protection work;crop yield;cropping pattern;program planning;project intervention;farmer organization;financial sustainability;rainfall pattern;water control;complementary investment;agronomic practice;cropping intensity;dug well;farm income;Institutional Sustainability;dry spell;dry season;shallow aquifers;tube wells;improved water;diversion structure;community participation;monitoring compliance;financing arrangement;hydrological study;Social Assessment;international waterway;inadequate service;involuntary resettlement;indigenous people;Indigenous Peoples;water productivity;natural habitat;public consultation;extension service;financing source;Project Monitoring;chronic problem;performance management;beneficiary impact;stakeholder workshop;donor support;outcome indicator;river flow;modern technology;irrigation management;international standard;water availability;domestic growth;rural area;agricultural season;ethnic composition;poor road;high river;river morphology;dominant group;temporary diversion;drainage structure;bank operation;modest increase;agricultural program;engineering study;construction supervision;engineering consultant;intake structures;agricultural improvement;delivery service;core indicator;monsoon rains;clear delineation;irrigation facility;agriculture sector;sustainable services;asset replacement;irrigation development;water course;hierarchical management;political situation;official estimates;good performance;reliable water;forestry sector;flood protection;cereal crop;agricultural modernization;intensive cropping;agricultural productivity;institutional innovation;private contract;demonstration plots;agricultural production;agriculture production;adaptive research;production increase;adaptive process;soil nutrient;consulting service;participatory monitoring;implementing partner;Water Management;certified seed;Consulting services;private institution;agricultural support;agricultural specialist;farmer training;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.