Detalhes
-
Autor
-
Data do documento
2020/12/23
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR44173
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/12/23
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Santa Cruz Road Corridor Connector Project (San Ignacio - San Jose) - P152281 - Sequence No : 07
-
Palavras-chave
improvements in road safety; access to water; road corridor; Investment Project Financing; Gender-Based Violence; gender based violence; prevention of gender; indigenous communities; indigenous community; tuberculosis prevention; civil works; transport accessibility; water service; water well; water access; road section; Water Services; health network; hiv testing; contract worker; external input; operation risk; risk category
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.