The project objective of the Power Engineering Project for Argentina was to assist the Government in implementing measures to improve the efficiency of electricity distribution by providing the utilities with modern methodologies and supporting equipment for planning and design of the distribution system.The project made an important contribution to the power sector by assisting the Government in identifying and addressing some key organizational, functional and technical problems which impeded the coordinated and efficient development of distribution facilities. Another project achievement was that it provided the most important distribution utilities in the country with modern equipment, computer hardware and software, and methodologies to improve their planning and design capabilities. The lending program was focused upon: (a) technical assistance to strengthen the Government's analytical and administrative ability to design and implement economic reform programs; (b) financial assistance to support the process of structural reform and growth; and (c) playing a catalytic role in increasing external resource flow.

Detalhes

  • Data do documento

    1994/11/04

  • TIpo de documento

    Relatório de Conclusão do Projeto.

  • No. do relatório

    13682

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Argentina,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2010/06/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    Argentina - Power Engineering Project

  • Palavras-chave

    efficiency of resource use;access to electricity service;privatization of distribution company;planning and design;provincial utility;hydroelectric power plant;condition of effectiveness;system of accounts;system Accounts;cost of living;weights and measure;technical assistance program;thermal power plant;expansion of transmission;channels of communication;regulation of concession;abundant natural gas;efficiency of electricity;distribution and transmission;difficulties due;quality and efficiency;procurement of computer;institutional development impact;total energy consumption;cost of service;Oil and Gas;Oil & Gas;economic reform program;per capita consumption;cost of distribution;allocation of resource;regional power distribution;transmission and distribution;price of oil;demand side management;lack of knowledge;distribution facility;expansion plan;operational planning;distribution network;counterpart fund;foreign consultant;engineering planning;load curve;pilot program;loan condition;inventory control;borrower performance;loss reduction;statistical data;metering equipment;modern equipment;successful privatization;project execution;local costs;computer hardware;store management;electricity distribution;budget control;technical standard;investment restriction;financial control;distribution investment;aggregate distribution;regional preferences;distribution business;electrical system;statistical tool;regional distribution;electrical utility;electrical generation;financial covenant;electricity tariff;hydroelectric plant;qualified professional;privatization process;transmission expansion;electricity bill;rural system;generation system;distribution concessionaire;supply situation;meter reading;consulting service;real benefits;political decision;technical equipment;exchange rate;Exchange Rates;demand forecast;load characteristic;Consulting services;legal aspect;magnetic storage;optimization model;adequate records;pricing policy;residential load;temperature variation;power utilities;national industry;distribution loss;warehouse management;consumption pattern;project costing;consumer demand;tariff policy;foreign exchange;equipment purchase;supply capacity;loan approval;power utility;external support;national utility;adequate participation;information dissemination;process information;reporting procedure;accounting procedure;skill base;financial situation;financial gap;constitutional autonomy;financial rule;lending strategy;modest increase;external resource;lending priority;energy development;private enterprise;energy resource;guarantee agreement;financing mechanism;liquid fuel;electrical power;power supply;energy loss;self-financing capacity;institutional relationship;distribution level;medium-term plan;project studies;foreign expenditure;project finance;project administration;upper management;functional classification;investment loan;provincial distribution;Labor Union;administrative support;sector work;labor problem;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.