China - Hebei Clean District Heating Project : resettlement plan (Vol. 2) : Abbreviated resettlement action plan for Pingshan country (Inglês)

The development objective of the Hebei Clean District Heating Project for China is to improve the efficiency and environmental performance of heating systems in project areas of selected municipalities of Hebei province. Negative impacts include: loss of land acquisition, loss of income, loss of household property, loss of asset, loss of trees and crops, and loss of livelihood. Mitigation measures include: land acquisition and involuntary resettlement should be avoided or minimized where feasible by developing and comparing a series of design alternatives; pay compensation and provide other resettlement entitlements before physical or economic displacement. Compensation and entitlements provided must be adequate to allow those affected to at least maintain their pre-project standard of living, with the prospect of improvement; (iii) land temporarily occupied and the period for disruption are to be kept to a minimum; (iv) all affected persons, titled and non-titled, and renters/contractors are to be taken into consideration; (v) resettlement plan should be prepared and implemented in accordance with state land rehabilitation policy, national economic and social development plans and WB IR policy; (vi) all those affected will be adequately informed about eligibility, compensation rates and standards, livelihood and income restoration plans, and project timing; (vii) resettlement plan should be coordinated with regional development, economic development and environmental protection; (viii) practical and feasible measures should be formulated to restore the affected items; (ix) a preferential policy and assistance will be provided to vulnerable groups in such things as employment; and (x) close monitoring and timely actions will be carried out to identify and resolve any problems.

Detalhes

  • Autor

    Kang,Tianxiu

  • Data do documento

    2015/09/01

  • TIpo de documento

    Plano de reassentamento

  • No. do relatório

    SFG1436

  • Nº do volume

    2

  • Total Volume(s)

    4

  • País

    China,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2015/10/27

  • Disclosure Status

    Disclosed

  • Nome do documento

    Abbreviated resettlement action plan for Pingshan country

  • Palavras-chave

    heat exchange;average annual output;Environmental Management Plan;Occupation;urban roads;negative social impacts;resettlement action plan;land occupation;method of valuation;public building;pipeline construction;standard of living;loss of asset;city planning department;department of finance;compensation for land;real estate developer;high school student;Thermal Power Generation;construction and equipment;central heating system;land use right;road network construction;early warning system;social and environmental;poor household;cultivated land;local resident;heating rate;heat meter;Urban Planning;heating source;land compensation;autonomous region;heat capacity;resettled persons;automatic monitoring;village committee;vulnerable group;beneficiary population;construction enterprise;road junction;branch road;agricultural population;Social Assessment;floor area;gross investment;affected persons;land administration;counterpart fund;public security;living standard;price control;land area;external monitoring;daily life;land acquisition;construction stage;construction planning;access road;road section;flying dust;construction material;connecting road;socioeconomic survey;safety measure;vegetable plot;subproject preparation;resettlement plan;automatic control;Waste Material;replacement cost;vegetable land;Fixed Assets;road grade;housing construction;resettlement policy;impact analysis;heat supply;villagers committee;installed capacity;conventional stations;irrigated land;urban construction;rural population;transaction cost;resettlement program;investment resource;resettlement activities;involuntary resettlement;road structure;urban population;improvement charge;residential area;compensation agreement;asphalt pavement;transportation construction;public finance;budgetary revenue;subproject implementation;fiscal revenue;co2 emission;project construction;affected communities;vulnerable household;construction process;Traffic Safety;internal monitoring;affected population;municipal facility;extensive consultation;impact survey;construction period;funding source;working capital;file complaints;financial cost;construction investment;engineering technology;arbitration award;dust emission;civil court;tertiary industry;information channel;disposable income;urban resident;land exploitation;road traffic;residential community;busy road;construction site;heat rate;basic skill;social status;asset compensation;interior decoration;legal domicile;Property management;community workers;field visits;public area;bulletin board;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.