Detalhes
-
Data do documento
2008/05/09
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR12884
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/23
-
Disclosure Status
Disclosed
-
Nome do documento
Bangladesh - Private Sector Infrastructure Development (PSIDP)
-
Palavras-chave
private participation in infrastructure development;private sector participation in infrastructure;financial and private sector development;remote area power supply;natural disaster risk management;economic and financial analysis;project design and implementation;public switched telephone network;rehabilitation need;Regulation and Competition Policy;power sector development;disaster vulnerability reduction;transparent procurement process;Promoting Private Sector;maintenance of infrastructure;power sector reform;risk sharing mechanisms;secondary road network;domestic capital market;Flood Recovery;construction and operation;source of funding;Oil & Gas;support for investment;reconstruction and rehabilitation;Oil and Gas;quality control laboratory;private sector involvement;quality of work;operation of infrastructure;investment advisory service;quality of supervision;lack of transparency;independent power producer;development of infrastructure;private infrastructure development;quality at entry;increase in prices;project costing;government commitment;infrastructure facility;primary road;regulatory environment;transaction process;efficient operation;regulatory structure;public financing;discount rate;outcome targets;infrastructure sector;grant basis;political interference;affected population;commercial investment;infrastructure rehabilitation;private investment;efficient infrastructure;debt finance;Social Assessment;loan size;local procurement;procurement rule;competitive cost;foreign currency;flood damage;rehabilitation activities;private investor;small loan;physical work;reconstruction work;work contracts;emergency response;regulatory regime;private auditors;dry season;severe flood;political turmoil;acceptable standard;culvert rehabilitation;infrastructure component;legal regime;clear rules;licensing processes;competitive procurement;political superiors;urban development;emergency program;insufficient information;Continuing Education;transition arrangement;governance issue;positive impact;procurement procedure;project datum;Energy Sector;technical competency;high reliability;regulatory system;infrastructure capacity;Cash flow;working relationship;negative effect;commercial entity;finance infrastructure;term finance;government capacity;institutional change;term debt;private venture;power capacity;urban roads;project pipeline;governance environment;budget support;raw material;industrial plant;credit increase;edible oil;infrastructure service;institutional linkage;staff resource;Disaster Management;incentive structure;Political Economy;project financing;regulatory need;financial rate;competitive conduct;borrower's performance;economic recovery;initial deposit;food grain;private ownership;fishery component;Fish Farm;consumer willingness;international agency;financial crisis;inadequate infrastructure;technical expert;heavy burden;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.