Skip to Main Navigation

Yemen - Taiz Municipal Development and Flood Protection Project (Inglês)

Detalhes

  • Data do documento

    2007/12/06

  • TIpo de documento

    Folhas de Dados Integradas sobre Salvaguardas

  • No. do relatório

    AC3324

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Iêmen, República do

  • Região

    Oriente Médio e Norte da África,

  • Data de divulgação

    2007/12/06

  • Disclosure Status

    Disclosed

  • Nome do documento

    Yemen - Taiz Municipal Development and Flood Protection Project

  • Palavras-chave

    flood;solid waste management strategy;Environmental and Social Impact;access to employment opportunity;access to urban service;supply and installation;multi criteria analysis;capacity building program;Safeguard Policies;safeguard policy;wastewater treatment facility;safety of dam;wastewater treatment plant;inherent health risks;response to crisis;use of wastewater;negative environmental impact;public sector infrastructure;attendance in school;cost of maintenance;capacity building support;protection of property;resettlement action plan;public land management;local tax administration;flood protection structure;program of support;incidence of malaria;flood damage prevention;means of escape;social and environmental;flood water;involuntary resettlement;construction phase;Social Assessment;environmental aspect;city resident;public consultation;local council;public awareness;mitigation measure;monitoring plan;Environmental Assessment;cultural property;wastewater collection;street name;safety issue;civil works;flash flood;construction method;building material;sea level;municipal revenue;Land Registration;impact analysis;focus group;field visits;affected communities;sanitary landfill;natural habitat;affected population;unforeseen circumstance;urban settlement;safeguard analysis;operations manual;budgetary framework;physical characteristic;temporary resettlement;social scientist;project costing;street paving;drainage channel;cultural significance;environmental health;preventative measure;social isolation;protective measure;garbage collection;investment loan;Job Creation;public health;poverty alleviation;institutional responsibilities;local ngo;public place;institution building;resettlement issue;environmental mitigation;limited capacity;environmental matters;indigenous people;retention basin;indirect impact;pedestrian access;sewage collection;house connection;construction work;irreversible impacts;safeguard issue;international waterway;Performance Standards;Indigenous Peoples;water pollution;sewage discharge;flood channel;geographic area;rainfall event;retaining wall;flood flow;agricultural dam;spillway capacity;environmental risk;commercial areas;stormwater drainage;financial loss;administrative capital;system design;traffic system;Public Services;social acceptance;parking area;social safeguard;municipal management;administrative structure;detailed planning;response time;basic equipment;land acquisition;awareness program;vehicular access;surface drainage;soil erosion;construction activities;household connection;noise impact;project impact;decentralization program;sewerage collection;domestic wastewater;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.