Skip to Main Navigation

Integrated Safeguards Data Sheet (Appraisal Stage) - Yunnan Highway Asset Management Project - P132621 (Inglês)

Detalhes

  • Autor

    Zhai,Xiaoke

  • Data do documento

    2014/10/22

  • TIpo de documento

    Folhas de Dados Integradas sobre Salvaguardas

  • No. do relatório

    ISDSA9045

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    China,

  • Região

    Leste Asiático e Pacífico,

  • Nome do documento

    Integrated Safeguards Data Sheet (Appraisal Stage) - Yunnan Highway Asset Management Project - P132621

  • Palavras-chave

    degradation of critical natural habitats;road asset management system;Environmental Codes of Practice;indigenous people development plan;land acquisition;Safeguard Policies;safeguard policy;Investment Project Financing;Indigenous Peoples;domestic waste management;soil erosion control;Solid Waste Management;natural disaster management;road safety situation;trunk highway system;road safety policy;emergency response;construction activities;involuntary resettlement;land use;physical activity;integrated management;public consultation;Ethnic Minorities;positive impact;road authority;social disturbance;safeguard issue;project costing;project finance;resettlement implementation;construction phase;resettlement plan;public meeting;road alignment;road maintenance;Management Systems;management strategy;materials processing;mitigation measure;road pavement;water resource;annual precipitation;financing source;safeguards data;pavement material;local ngo;capacity enhancement;data management;environmental monitoring;feedback mechanism;construction wastewater;temperate zone;rainy season;evaluation system;lower emission;project impact;tropical zone;tourism industry;infrastructure service;climatic patterns;safeguards requirement;irreversible impacts;asset value;asphalt pavement;chip seal;process change;accounting policy;asset valuation;natural heritage;acceptable accounting;highway maintenance;highway condition;information transmission;patrol vehicles;management improvement;business system;protection zone;emergency rescue;inspection for vehicle;safeguard analysis;civil works;physical characteristic;performance management;natural reserve;wastewater treatment;cultural relic;international waterway;data exchange;engineering design;social aspect;level of change;business process;resettlement issue;project datum;resettlement planning;Social Assessment;transportation authority;road management;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.