Skip to Main Navigation

Monthly Operational Summary of Bank and IDA Proposed Projects (as of June 15, 1992) (Inglês)

In October 1989, the Bank established a specific policy and procedures for environmental assessment and related environmental analyses of International Bank for Reconstruction and Development (IBRD) and International Development Association (IDA) lending operations. Under this environmental assessment process, the type, timing, and main issues of environmental analysis to be performed by the borrower are to be confirmed at the time that a given lending operation is initiated into the Banks prospective lending program and thereafter reported and updated on a quarterly basis in the monthly operational summary. The monthly operational summary contains an environmental annex which includes the environmental data sheets for Category A projects and data sheet headers for specific Category B projects, and a listing of projects in Categories C and T.

Detalhes

  • Data do documento

    1992/07/01

  • TIpo de documento

    Resumo de Desembolsos Mensais

  • No. do relatório

    145381

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Mundo,

  • Região

    Regiões Mundiais,

  • Data de divulgação

    2020/06/06

  • Disclosure Status

    Disclosed

  • Nome do documento

    Monthly Operational Summary of Bank and IDA Proposed Projects (as of June 15, 1992)

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.