Skip to Main Navigation

Gambia - Electricity Support Project (Inglês)

Ratings of Electricity Support Project for The Gambia were as follows: outcome was satisfactory, Bank performance was highly satisfactory, and monitoring and evaluation quality was substantial. Some of the lessons learned include: (i) An effective structure needs to be established to ensure that National Water and Electricity Company (NAWEC) conducts regular maintenance of its generating assets; (ii) Establish an effective sludge management system; (iii) Developing strong Occupational Health and Safety (OHS) practices; (iv) A functional grievance redress mechanism (GRM) at an institutional level is essential to ensure adverse project impacts can be addressed; (v) Keep it simple and flexible; (vi) Project Implementation Unit (PIU) staff should be dedicated to the project to ensure timely project implementation; and (vii) Strengthening assistance and building capacity in the areas of procurement and E&S safeguards in an fragile conflict and violence (FCV) environments are a key ingredient to ensure a successful implementation.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.