Detalhes
-
Autor
Ohene Sarfo
-
Data do documento
2021/03/30
-
TIpo de documento
Plano de Aquisições
-
No. do relatório
STEP47143
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/03/30
-
Disclosure Status
Disclosed
-
Nome do documento
Ghana - AFRICA WEST- P164330- Greater Accra Resilient and Integrated Development Project - Procurement Plan
-
Palavras-chave
Gender-Based Violence; solid waste management improvements; Social Impact Assessment; solid waste management consultant; detailed engineering design; low income community; allocation of responsibility; contract award information; Revised Plan Date; improving waste management; performance based contract; waste transfer station; access to land; landfill base; grievance redress mechanism; market approach; drainage basin; competitive procurement; management selection; dredged material; bathymetric survey; integrated development; landfill site; digital camera; national procurement; rapid assessment; high sea; readiness assessment; Land Ownership; retention basin; procurement procedure; car park; selection component; national market; climate reconstruction; extension work; technical proposal; credit contract; meteorological equipment; weather station; waste bin; motor bike; laptop computer; community profile; complaints mechanism; procurement transaction; leased assets; domestic preference; procurement activities; routine maintenance; governmental organisation; procurement opportunity; project plan; safeguard specialist
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.