Skip to Main Navigation

Pakistan - Balochistan Integrated Water Resources Management and Development Project (Inglês)

The development objective of the Balochistan Integrated Water Resources Management (IWRM) and Development Project for Pakistan is to strengthen provincial government capacity for water resources monitoring and management and to improve community-based water management for targeted irrigation schemes in Balochistan. This project comprises three components. The first component, institutions, capacity and information will support a gradual transition to IWRM approaches in Balochistan in line with the existing IWRM policy. It will support institutional restructuring, professional development, installation and operation of hydro-meteorological systems, and establishment of multi-agency river basin information systems that provide public access to all available hydromet data for the two project basins. It has two sub-components. i) It will support institutional strengthening and restructuring, and ii) It will support hydro-meteorological data collection and management to provide the required information platform for improved water resources planning. The second component, water infrastructure and management investments will support implementation of IWRM sectoral investments in the Nari and Porali basins within a framework of community mobilization and participation. This components has three sub-components includes i) Construction and/or rehabilitation of irrigation and potable water supply facilities; flood protection infrastructure; ii) Related watershed and rangeland management; and iii) On-farm water management and agricultural productivity activities. The third component, project management and technical assistance will finance expenditures associated with overall project implementation costs, including incremental costs associated with the Project Management Unit (PMU) and the Project Implementation Units (PIUs), Project Supervision and Implementation Assistance (PSIA)consultants, M&E consultants, and implementation of Management Plans and Strategic Studies including the Environmental Management Plan (EMP), the Social Mitigation Plan and the Gender Action Plan (GAP). Study tours will also be included with piloting of new technologies and others that may be identified during project implementation, as well as feasibility studies for other river basins.

Detalhes

  • Data do documento

    2016/06/07

  • TIpo de documento

    Documento de avaliação do projeto:

  • No. do relatório

    PAD1661

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Madagascar,

  • Região

    Sul da Ásia,

  • Data de divulgação

    2016/06/29

  • Disclosure Status

    Disclosed

  • Nome do documento

    Pakistan - Balochistan Integrated Water Resources Management and Development Project

  • Palavras-chave

    Investment Project Financing;Annual Work Plan and Budget;Grievance Redress Service;Fragile, Conflict & Violence;Economic Internal Rate of Return;River basin;operations and maintenance;irrigation scheme;Environment and Natural Resources;agriculture, fishing, and forestry;on-farm water management;monitoring and evaluation system;Social and Environmental Assessment;national water policy framework;scheme will;canal and drainage;management of water resource;rural community water supply;Tax Policy and Administration;project monitoring and evaluation;Soil and Water Conservation;early stages of implementation;potable water supply;rangeland management;matching grant;financial management specialist;flood protection work;capacity for implementation;security situation;scarce water resource;improve water resource;Water and Agriculture;responsibility for water;Water Resource Management;grievance redress mechanism;surface water resource;per capita income;power sector reform;technology and markets;water storage tank;water sector reform;risk mitigation strategy;canal irrigation systems;development of water;reverse environmental degradation;opportunity for woman;lack of investment;flood control infrastructure;Integrated Pest Management;community water management;integrate water resource;number of beneficiaries;construction and rehabilitation;village water supply;flood protection infrastructure;public sector institution;incentive for farmer;constraints on access;climate change resilience;future climate change;large irrigation system;sources of water;total water use;lack of infrastructure;long-term poverty reduction;natural disaster management;provincial government level;exchange rate;Exchange Rates;resettlement and rehabilitation;readiness for implementation;Safeguard Policies;safeguard policy;information & communication;net present value;secure water supply;department of agriculture;water reform agenda;impact on health;water distribution network;reliable water supply;watershed protection activity;water resource development;surface water irrigation;geographic information system;gdp growth rate;water resource planning;national economic growth;irrigation and drainage;watershed management;civil works;rural livelihood;institutional change;groundwater resource;water availability;Rural Poor;result indicator;Irrigated Agriculture;irrigation water;groundwater recharge;fiduciary risk;open access;agricultural productivity;project costing;irrigation infrastructure;observation network;qualified accountants;long-term process;retroactive financing;local market;internal audits;government capacity;data transmission;intense rainfall;legal advice;improved water;water scarcity;tribal groups;community mobilization;professional development;community participation;hydrological data;security risk;federal government;flood damages;water infrastructure;political instability;governance risk;incremental benefits;gradual transition;irrigated area;water planning;water user;flash flood;economic stagnation;national policy;fiscal situation;fiscal deficit;Irrigation Agronomy;precious stone;livestock farming;livestock productivity;storage capacity;international waterway;production system;data limitation;program operations;farm development;construction cost;diversified cropping;crop yield;cropping intensity;resource base;efficient management;government response;sustainable livelihood;agricultural activity;agronomic practice;local beneficiary;sensitivity analysis;macroeconomic risk;political parties;political party;Social Protection;power reform;development partner;farm productivity;professional specialist;tribal community;crop intensification;learning framework;Economic Policy;agricultural practice;investment component;irrigation management;access road;results framework;water board;social outcome;distribution infrastructure;downstream communities;stakeholder consultation;increased transparency;populous country;community resource;inadequate water;hydropower development

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.