Detalhes
-
Autor
-
Data do documento
2019/11/05
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR38603
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2019/11/05
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project - P158760 - Sequence No : 03
-
Palavras-chave
quality of water supply service; rural water supply system; cost of water supply; water and wastewater; water supply management; wastewater treatment facility; capacity for implementation; wastewater treatment plant; water supply pipeline; piped water supply; Investment Project Financing; loan disbursement; outcome indicator; wastewater management; total water; pipe network; risk category; operation risk; wastewater service; first year; new connections; sewerage system; water meter; water global
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.