The rural road gravel assessment program (RRGAP) comprised the evaluation of a representative selection of 269 World Bank (WB)-funded road links from 16 provinces. Between 2003 and 2012 three phases of trial road selection, design, and construction were undertaken under the RRST program. The objective was to compare new pavement options in terms of construction and in-service performance against a number of standard Vietnamese control sections, monitoring of the trial sections commenced as soon as construction was completed. A total of 156 kilo meter (km) of trial roads have been constructed within a range of road environments in 16 provinces, from which a representative 123 sections of between 80m to 200m in length have been selected for ongoing performance monitoring. The condition monitoring of the Vietnamese trials has resulted in the assembly of a significant amounts of data on the performance of a wide variety of pavement and surfacing types.
Detalhes
-
Autor
-
Data do documento
2014/01/01
-
No. do relatório
98242
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2015/07/26
-
Disclosure Status
Disclosed
-
Nome do documento
Improving Vietnam’s sustainability : key priorities for 2014 and beyond
-
Palavras-chave
road performance data;traffic environment;pavement option;road environment;road sector;high rainfall;road link;drainage;pavement type;local management;mountainous area;national requirement;technical standard;research outcome;surface type;road classification;chip seal;local network;steep gradient;road pavement;comparative analysis;supervision arrangements;axle load;gravel loss;construction cost;road design;flood;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.