Skip to Main Navigation

Environmental and Social Impact Assessment Second Dam Rehabilitation and Improvement Project (P170873) (Inglês)

Detalhes

  • Autor

    Borrowing Agency

  • Data do documento

    2021/07/29

  • TIpo de documento

    Avaliação Ambiental,Environmental and Social Assessment,Avaliação social

  • Nº do volume

    1

  • País

    Índia,

  • Região

    Sul da Ásia,

  • Data de divulgação

    2021/07/29

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental and Social Impact Assessment Second Dam Rehabilitation and Improvement Project (P170873)

  • Palavras-chave

    dam; Environment and Social Management Framework; Environment and Social Management Plan; command and control; Environmental and Social Management Plan; Supervisory Control and Data Acquisition; Environmental and Social Impact Assessment; information and communication technology; community health and safety; terms and conditions of employment; Occupational health and safety; sexual harassment at work; legal and regulatory framework; monitoring and evaluation system; implementation of mitigation plans; waste generation; risk of spillage; early warning system; emergency action plan; gender based violence; existing capacity; dam safety review; central water commission; personal protective equipment; dam safety management; risk of exposure; supply and installation; hazardous waste generation; physical environment; air emission; water resource; dam safety program; flood warning system; catchment area treatment; conservation of resource; discrimination in employment; dam safety guideline; management of flood; protection of workers; Sexually Transmitted Disease; emergency response system; new dam project; hydropower development; acquired immunodeficiency syndrome; safety of dam; land cover map; built up area; drinking water source; means of information; domestic water supply; access to land; use of resources; summary of risks; height of dam; machinery and equipment; skilled migrant labour; grievance redress mechanism; geographic information system; resettlement and rehabilitation; solar power system; Human Immunodeficiency Virus; protected area; high noise; land use; stakeholder consultation; dam reservoir; preparatory work; labour camp; approach road; construction stage; dam site

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.