Malawi - First Phase of the Shire River Basin Management Program Project : environmental assessment (Vol. 2) : Final environmental and social assessment report (Inglês)

The objective of the First Phase of the Shire River Basin Management Program Project for Malawi is to make significant progress in achieving socially, environmentally and economically sustainable development in the Shire Basin. Negative measures include: water quality, noise levels, soil erosion, loss of vegetation, air quality, dust, and ecology. Mitigation measures include: a) for all work areas, after the topsoil has been replaced and worked, appropriate grass mixtures should be planted to initially stabilize the areas before they are landscaped with native plants common to the area; b) workers should not be allowed to harvest natural resources unless approved by local communities and the project's environmental inspectors; c) adequate sanitary facilities and have to be established, and removal of solid waste and waste water with no contamination of water and the environment; d) limitation of working hours and the circulation of trucks between 7h00 and 19h00 and no work during weekends; e) where culverts or pipes have been installed, line water flow exit points with stone or cement rip-rap for a length of at least two meters; and f) ensure the construction crew is aware remaining vegetation must not be touched or damaged.

Detalhes

  • Data do documento

    2013/07/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E2919

  • Nº do volume

    2

  • Total Volume(s)

    5

  • País

    Malaui,

  • Região

    África,

  • Data de divulgação

    2014/08/29

  • Disclosure Status

    Disclosed

  • Nome do documento

    Final environmental and social assessment report

  • Palavras-chave

    community based natural resource management;national water resource;Strategic Environmental and Social Assessment;Environmental and Social Impact;hiv prevalence rate;environmental and social assessment study;Environmental and Social Impact Assessment;food and agriculture organisation;Environmental and Social Safeguard;Land and Water Resources;resilience to climate risk;Soil and Water Conservation;natural resource management institutions;Management of Natural Resources;efficient use of water;access to rural finance;alternative sources of water;Evaluation of Environmental Impact;catchment;sustainable natural resource management;water allocation and use;natural resource management systems;basin water resource management;HIV and AIDS;natural resource base;institutional capacity building;water quality parameter;economically sustainable development;small scale irrigation;source income;source of income;planning and design;revenue from tourism;decision support system;income generating activity;water resource planning;water monitoring stations;adverse environmental impact;small earth dams;social and environmental;Access to Electricity;catchment management activities;civil society group;analysis of alternatives;rapid population growth;regional land use;catchment management plan;early warning system;sustainable development plan;water resource availability;alternative livelihood development;rural water supply;implementation of policies;downstream water user;establishment of community;Research and Innovation;short training course;water resource planners;human resource management;sustainable water resource;community awareness raising;flood management activities;flood risk management;management of forest;enhanced food security;hydro power station;flood diversion structure;protection of human;improve water resource;water investment planned;human resource capacity;Flood Mitigation;water flow;protected area;Water Management;water level;basin level;investment planning;civil works;soil erosion;positive impact;community level;environmental degradation;productive potential;system operation;basin management;large-scale infrastructure;sustainable land;land degradation;smallholder farmer;basin planning;social consideration;groundwater monitoring;social implications;environmental change;check dam;hydropower generation;social issue;environmental sustainability;community management;real time;program performance;rural livelihood;natural habitat;mitigation measure;weed management;field investigation;improved water;animal population;satellite imagery;alternative energy;flood zone;improved livelihood;economic sector;cross point;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.