Tanzania - Transport Sector Support Project : environmental assessment : Environmental and social impact statement : detailed engineering design and preparation of tender documents for the rehabilitation of the Arusha - Minjingu road and construction of new Arusha western bypass (Inglês)

The objective of the Transport Sector Support Project is to improve the performance of the transport sector in Tanzania in order to enhance economic growth and reduce poverty. Negative measures include: air pollution, noise, erosion, water resources, natural resources, and impact on tourism. Mitigation measures include: a) protect susceptible surfaces with mulch, and plant erodible surfaces as soon as possible; b) fine particle materials on site like cement should be enclosed and covered; c) wheel washing facilities shall be installed and used by all vehicles leaving the site; d) design and construct appropriately located rest areas at scenic location; e) ensure that the road is designed and build with most suitable road surface taking into account the road roughness; f) rehabilitate existing and new borrow areas and quarries such that communities benefit from the potential water holes by trimming with shallow slopes allowing livestock access; and g) provide drainage works as needed to reduce risk, according to prior surveys.

Detalhes

  • Data do documento

    2008/09/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E2354

  • Nº do volume

    1

  • Total Volume(s)

    5

  • País

    Tanzânia,

  • Região

    África,

  • Data de divulgação

    2010/01/26

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental and social impact statement : detailed engineering design and preparation of tender documents for the rehabilitation of the Arusha - Minjingu road and construction of new Arusha western bypass

  • Palavras-chave

    medium term expenditure framework;Environmental and Social Impact Assessment;road construction material;pavement evaluation;agriculture and livestock;Acquired Immune Deficiency Syndrome;access to health service;water borne disease;detailed engineering design;vehicle operating cost;waste disposal facility;impact on tourism;number of women;domestic water supply;number of orphans;heavy goods vehicle;income generating activity;primary school dropout;Environmental Management Plan;loss of income;HIV and AIDS;availability of fund;child headed household;distribution of condoms;road safety education;change in behaviour;number of road;roughness of road;community base;lines of communication;analysis of alternatives;hiv prevalence rate;social and environmental;asphalt concrete surfacing;letter of notification;land use plan;law and regulation;sale of land;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.