Ratings for the First Transport Project for Poland were as follows: outcomes were highly satisfactory, Bank performance was satisfactory, and the Borrower performance was also satisfactory. Some lessons learned included: creation of the specialized unit for procurement within the railway, headed by someone with international procurement experience, and the retention of that specialist throughout implementation, was an immense help. Continuity of task manager from the preparation phase through implementation yields considerable benefits in terms of the efficiency and consistency of the Bank's role. A broad initial project in a sector can prove valuable in opening the door for subsequent lending operations which then pursue in more detail and in narrower fields the institutional band policy reforms analyzed under the first operation.
Detalhes
-
Data do documento
1997/06/13
-
TIpo de documento
Conclusão da Implementação e Relatórios sobre Resultados
-
No. do relatório
16722
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Poland - First Transport Project
-
Palavras-chave
Maintenance & repair; Modernization; Railways; Road & highway networks; Rolling stock; Railway signaling equipment; Institution building; Management information systems
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.