China - Shanghai Urban Environment Project : environmental impact assessment (Vol. 2) : Environmental assessment : summary report (Inglês)

The environmental assessment for the Shanghai Urban Environment Project for China provides details of measures to be employed to mitigate negative environmental impacts anticipated from the project. They include the following: Resettlement scheme will be prepared for project affected persons. Industrial and commercial suffering economic loss will be provided compensation and relocated according to Chinese and local laws. Land use plans will minimize the reduction of land used for cultivation. Those affected by land acquisition will be compensated according to Chinese regulations. Cleaning up the site, refilling the topsoil, and collecting manure and using fertilization will alleviate soil infertility. Temporary ditches will be built to control problems caused by destroyed irrigation and drainage works. A temporary passage will be built to replace destroyed farm roads. Temporary detours and bridges will be constructed to re-route traffic on roads, bridges, and riverways. A sand sink pool will alleviate river pollution. The project will adhere to a discharge standard to prevent water pollution. To minimize noise, construction will not operate at night within 200 m of residential areas and a sound barrier will be erected. Waste will be disposed of according to a disposal plan and will be prevented from release onto farmland or into rivers, channel ponds, etc. Waste will be used to fill up the base of a newly-built building or for some other project.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.