Argentina - Second Norte Grande Water Infrastructure Project (Inglês)

The objective of the Second Norte Grande Water Infrastructure Project is to increase sustainable access to sanitation and water supply services in the Norte Grande region of Argentina, by providing investments in infrastructure and supporting institutional development. There are three components to the project, the first component being water supply and sanitation infrastructure. This component include: carrying out of demand-driven subprojects consisting of the rehabilitation, upgrading and reconstruction of participating provinces: (i) wastewater collection, conveyance, treatment and disposal systems, such as wastewater treatment plants, pumping stations, main collectors and secondary sewerage networks; and (ii) water supply systems including, for instance, production and distribution systems that are considered category A from their environmental impact assessment perspective. The second component is the institutional and operational development and technical assistance. Finally, the third component is the project management and supervision. This component include: a) carrying out of specialized independent technical, environmental and social supervision of subprojects' implementation, as required; and (b) carrying out of project audits and monitoring and evaluation activities under the project.

Detalhes

  • Data do documento

    2011/03/07

  • TIpo de documento

    Documento de avaliação do projeto:

  • No. do relatório

    58791

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Argentina,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2011/03/18

  • Disclosure Status

    Disclosed

  • Disclosure Type

    1111495

  • Board Meeting Date

    2011-04-05T00:00:00Z

  • Nome do documento

    Argentina - Second Norte Grande Water Infrastructure Project

  • Palavras-chave

    access to water supply and sanitation;cumulative target;Environmental and Social Impact Assessment;Monitoring and Evaluation Unit;economic and financial analysis;Risks and Mitigation Measures;environmental and social management;andean development corporation;disaster risk management;real gross domestic product;investment in water supply;wastewater collection and treatment;access to urban service;people in urban area;Environmental and Social Safeguard;preparation of bidding documents;water supply service;investments in infrastructure;access to sewerage;wastewater treatment service;social and environmental;wastewater treatment plant;construction and rehabilitation;piped water supply;infrastructure investment program;flow of fund;construction and operation;safety of dam;water supply system;physical cultural resources;eligibility criterion;maintenance of system;analysis of alternatives;safe drinking water;environmental safeguard policy;standard of living;technical assistance program;poor rural community;investment in sanitation;participation of stakeholder;basic water supply;duplication of efforts;contamination of water;availability of water;exchange rate;access to information;sanitation and flood;national poverty level;measure of poverty;global financial crisis;negative environmental impact;wastewater treatment process;agricultural support service;wastewater treatment system;Exchange Rates;procurement capacity assessment;provision of good;allocation of fund;multilateral development bank;transfer of fund;environmental assessment process;water supply investment;institutional strengthening;environmental sustainability;subproject preparation;Safeguard Policies;sustainable access;economic slowdown;extreme poverty;federal government;program finance;real gdp;sanitation investment;pumping station;Sanitation Services;disposal system;budget line;resettlement plan;positive impact;severe drought;institutional context;federal program;public consultation;operational efficiency;federal level;operational deficit;household access;sewerage service;basic infrastructure;environmental condition;communication plan;Social Assessment;evaluation activity;natural habitat;external demand;commodity price;annual budget;agricultural production;private operator;retroactive financing;social crisis;socio-economic survey;financial sustainability;coverage rate;result indicator;protected area;Cultural Heritage;social cost;affected communities;global economy;indigenous affair;water resource;results framework;specific commitment;environmental agency;annual operation;project sustainability;tariff change;water tariff;self-financing capacity;income policy;Income policies;official statistic;fiscal performance;foreign trade;industrial activity;fiscal surplus;basic metal;Public Spending;economic crisis;Economic Stimulus;market force;financing policies;disadvantaged regions;low-income population;procurement activities;procurement arrangement;indirect employment;income generation;local economy;increased access;wastewater source;health problem;provincial legislation;consultation process;social analysis;vulnerable group;multiplier effect;health condition;cost benefit;private company;economic recovery;institutional stakeholders;procurement action;budgetary resource;sustainable operation;Proposed Investment;federal budget;government institution;provincial authority;focus group;mitigation program;environmental authority;involuntary resettlement;Indigenous Peoples;monitoring program;social standpoint;municipal government;metropolitan area;sanitation system;wastewater system;secure financing;social study;investment criterion;regional utility;social studies;investment lending;quality improvement;donor activities;market access;measuring poverty;concessional financing;public subsidy;organizational capacity;public good;outcome indicator;Basic Sanitation;strategic development;social inclusion;sanitation facility;institutional performance;guiding principles;finance activity

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.