Skip to Main Navigation

China - Changzhi Sustainable Urban Transport Project : environmental assessment (Vol. 2) : Environmental management plan : annex (Inglês)

The development objective of the Changzhi Sustainable Urban Transport Project is to improve transport mobility in the central city of Changzhi in a safe, sustainable, and efficient manner for all users. Negative impacts include: landscape would be damaged; dust, soil erosion, landscaping, land occupation; construction wastewater and solid waste would cause pollution in the river; noise pollution; and traffic safety. Mitigation measures include: 1) construction wastewater containing a lot of soil and grease, should be sediment before discharge into municipal pipeline, prohibiting direct discharge into surface water; 2) prohibit the operation of machinery with high noise and vibration during the noon, use machinery with low noise or adopt noise barrier methods like isolation and fence whereas possible; 3) sprinkle water on the transportation road, reducing dust as much as possible; 4) proper arrangement for construction time and location, for high noise construction, keep away from the sensitive receptors; 5) prevent dust pollution by fencing the site during construction period; 6) construction waste is prohibited to use as fuel for heating; and 7) make plans for traffic diversion and temporary access roads.

Detalhes

  • Data do documento

    2011/09/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E2858

  • Nº do volume

    2

  • Total Volume(s)

    3

  • País

    China,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2011/09/12

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental management plan : annex

  • Palavras-chave

    construction site;physical cultural resources;construction waste;cultural relic;construction of bridges;Traffic Safety;amount of electricity;noise control measure;safety of pedestrian;water and electricity;transportation of materials;surface water protection;green area;road section;construction wastewater;construction material;construction period;high noise;municipal sewers;steel plates;safety regulation;bus transport;direct discharge;dry weather;land occupation;speed control;Traffic Accident;police department;dangerous situation;driving time;project road;moisture content;city agencies;wastewater management;wash facility;temporary storage;construction road;noise source;noise level;dust control;sanitation department;landfill site;surface soil;Waste Management;traffic area;regional capacity;Traffic Control;construction phase;traffic separation;social life;transportation machinery;noise management;transport distance;pedestrian bridge;river channel;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.