Detalhes
-
Autor
-
Data do documento
2020/06/25
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR40550
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/06/25
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Lao Road Sector Project 2 (LRSP2) - P158504 - Sequence No : 07
-
Palavras-chave
implementation of road work; Public Works and Transport; On the Job Training; road safety audit; length of road; share of woman; performance based contract; routine maintenance; Investment Project Financing; road maintenance activity; road safety strategy; still under implementation; institutional strengthening; road improvement; climate resilience; district road; road condition; rolling plan; natural hazard; rural population; emergency response; award process; risk category; operation risk; audit training; contract management; payment process; road contracts; labour force; local contractor; travel restriction; Traffic Safety
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.