Skip to Main Navigation

Argentina - Salado Integrated River Basin Management Support Project : Restructuring (Inglês)

The development objective of the Salado Integrated River Basin Management Support Project for Argentina is to enhance flood protection and strengthen the capacity of the responsible institutions for integrated water resources monitoring and management in the Salado river basin. The restructuring will: (i) include a new component to respond to the Coronavirus disease 2019 (COVID-19) emergency with activities that stimulate job creation in the construction sector and increase the supply of housing for vulnerable populations; (ii) reduce the scope of activities related to the non-structural measures for water resources management in the context of the economic crisis; (iii) revise the project development objective (PDO) and results frameworks to reflect the changes to the activities supported by the project; (iv) make changes to the implementation arrangements; and (v) extend the loan closing date by 12 months to compensate for the COVID-19 related delays and ensure completion of new component.

Detalhes

  • Autor

    Albrecht,Martin Benedikt

  • Data do documento

    2021/02/25

  • TIpo de documento

    Documento do projeto

  • No. do relatório

    RES42334

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Argentina,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2021/02/25

  • Disclosure Status

    Disclosed

  • Board Meeting Date

    2021-02-25T00:00:00Z

  • Nome do documento

    Argentina - Salado Integrated River Basin Management Support Project : Restructuring

  • Palavras-chave

    social housing; Water Resource Management; river basin management; river training works; integrated water resources management; theory of change; social and environmental; flood and drought risk; worker health and safety; Job Creation; river basin committee; access to basic service; housing design and construction; community health and safety; housing construction; housing development; integrate water resource; water quality control; cost component; provision of infrastructure; physical cultural resources; climate co-benefits; water quality monitoring; flood risk map; living condition; construction sector; flood protection; short-term job creation; transfer of fund; affordable housing supply; exchange rate volatility; international bidding process; open competitive process; investment in housing; traditional construction methods; public works program; financial management arrangement; renewable energy technologies; capacity for implementation; movement of people; central government policy; public transport service; million people; economic multiplier effect; job creation potential; quality of house; gas distribution network; private sector engagement; procurement of work; incentives for investment; efficiency and quality; Beneficiary Registration; social service facility; geographic information system; flow of information; construction of housing; social risk management; internal control framework; flow of fund; efficiency of resources; Environmental Management Plan; delay in procurement; Investment Project Financing; institutional strengthening; land parcel; public resource; new house; river works; economic recovery; economic crisis; eligibility criterion; best practice

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.