The development objectives of the Electricity and Gas Improvement Project for Nigeria are to: (i) improve the availability and reliability of gas supply to increase power generation in existing public sector power plants; and (ii) improve the power networks capacity and efficiency to transmit and distribute quality electricity to the consumers. Some of the negative impacts and mitigation measures include: i) encroachment, damage to historically or culturally significant areas; ii) air pollution due to elevated levels of dust and gaseous emissions; iii) elevated noise and vibration levels that could cause nuisance and damage to properties; iv) improper handling of wastes could cause odor, vermin problems, pollution and obstruction of nearby water courses; v) pollution and safety risks due to use of hazardous materials and disposal of hazardous wastes; vi) damage to community utilities such as water supply pipes, irrigation canals, drainage, etc.may occur during construction activities; vii) traffic disruption and obstruction of access to roadside properties; viii) health and safety risks to workers and the public
Detalhes
-
Autor
-
Data do documento
2016/01/01
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
SFG1730
-
Nº do volume
1
-
Total Volume(s)
5
-
País
-
Região
-
Data de divulgação
2016/01/20
-
Disclosure Status
Disclosed
-
Nome do documento
Nigeria - Electricity and Gas Improvement Project : environmental and social impact assessment
-
Palavras-chave
federal government of nigeria;Integrated Environmental and Social Impact Assessment;Occupational health and safety;oil and gas company;discharge of hazardous substance;sources of water;Environmental and Social Safeguard;alternative sources of energy;operation and maintenance cost;gas fired power plant;gas power plant;gas-fired power plant;export credit agencies;private sector involvement;corporate social responsibility;transfer power;planning and design;emergency response procedure;gas turbine technology;ecological impact prediction;electricity generation capacity;level of compliance;secondary data;household waste disposal;source of energy;analysis of alternatives;water sample analysis;Environmental Management Plan;place of work;public consultation;contamination of soil;air quality data;ground water resource;electric power generation;global positioning system;transmission and distribution;storage of waste;electricity transmission grid;emissions to air;Human Immunodeficiency Virus;private sector ownership;electricity power plant;cycle gas turbine;international standards organization;power generation market;contaminant in water;wastewater treatment facility;water cooling system;domestic water consumption;electricity generating plant;water storage facility;availability of power;private sector participant;letter of intent;air intake system;law and regulation;air quality impact;treatment of effluent;construction and operation;Oil & Gas;radiation protection act;operations and maintenance;gas leak;mitigation measure;high concentration;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.