Detalhes
-
Autor
-
Data do documento
2014/09/30
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
Nº do volume
1
-
País
-
Região
-
Nome do documento
Togo - Emergency Infrastructure Rehabilitation and Energy Project : P113415 - Implementation Status Results Report : Sequence 09
-
Palavras-chave
people in urban area;emergency recovery loan;emergency infrastructure;compact fluorescent light bulb;energy efficient light bulbs;Financial Management and Accounting;Access to Electricity;project affected persons;water system;water point;Urban Infrastructure;community water;rainy season;satisfactory progress;peak load;Efficient Lighting;incandescent lamp;drainage construction;financial agreement;financial period;international standard;household connection;safeguard study;contract amount;borehole systems;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.