The development objective of the Karachi Mobility Project for Pakistan is to improve mobility, accessibility, and safety along selected corridors in Karachi. Some of the negative impacts and mitigation measures include: (1) cash payment for 12 months transitional allowance as per monthly income from the business (lump sum payment) for loss of business; (2) one-time lump sum payment in cash for transition period equivalent to 3 months as per officially announced minimum wage by the Government of Sindh (GoS) for loss of employment; and (3) temporary and permanent employment to members of project affected households (PAHs) during construction or operation of the project, where feasible.
Detalhes
-
Autor
Sindh Mass Transit Authority
-
Data do documento
2019/05/09
-
TIpo de documento
Plano de reassentamento
-
No. do relatório
SFG5456
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2019/05/10
-
Disclosure Status
Disclosed
-
Nome do documento
Compensation and Livelihood Rehabilitation Plan
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.