The objective of the Eskom Renewables Support Project is to facilitate accelerated development of large scale renewable energy capacity in support of the long-term carbon mitigation strategy of South Africa. Negative impacts include: air pollution, noise disturbance, solid wastage, water pollution, and health and safety of worker. Mitigation measures include: 1) minimize on-site storage of petroleum products; 2) ensure proper maintenance procedures in place for vehicles and equipment; 3) deposit solid waste in containers and dispose at municipal waste disposal sites regularly; 4) supply, maintain and enforce the use of mobile toilets at the work sites; 5) negotiate water use for dust suppression and formation compaction with landowners; 6) noise levels associated with civil construction equipment at a distance of 15 metres from the source lie in the range of 75 decibels (dBA) to 100dBA; 7) keep all construction vehicles and equipment in good repair; and 8) avoid noisy night-time activities.
Detalhes
-
Data do documento
2009/11/04
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E2872
-
Nº do volume
8
-
Total Volume(s)
-
País
-
Região
-
Data de divulgação
2009/11/11
-
Disclosure Status
Disclosed
-
Nome do documento
Medupi Power Plant and associated infrastructure : Delta-Epsilon 6 x 765KV transmission power lines - environmental impact report volume four, maps
-
Palavras-chave
study area;tailings dam;high sensitivity;fire risk;municipal boundaries;power line;vegetation cover;land use;Municipalities;Mining;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.