The objective of the Punjab Municipal Services Improvement Project for Pakistan is to improve the viability and effectiveness of urban services provided by the participating Tehsil Municipal Administrations (TMAs), and to make such improvements sustainable and replicable in other TMAs through the creation of a performance-based management framework at both TMA and provincial levels. The closing of the project will be extended be from the current closing date of November 30, 2012 to November 30, 2013. This is the second extension of the project (previously extended by 23 months) and constitutes a level two restructuring for approval, since this extension exceeds a two year extension from the original project closing date of December 31, 2010. The extension is necessary to: ensure that implementation of the pilot project in the Walled City of Lahore is completed; enable Punjab Municipal Development Fund Company (PMDFC) to more gainfully and sustainably institutionalize the reform initiatives under the project's Institutional Development (ID) sub-component; complete establishment of a system of vertical linkages between TMA-level reforms and the provincial Local Government and Community Development Department (LG&CDD); and ensure that the entire set of infrastructure investments under the project is fully operational and providing the envisaged service benefits to the citizens.
Detalhes
-
Data do documento
2012/11/09
-
TIpo de documento
Documento do projeto
-
No. do relatório
73655
-
Nº do volume
2
-
Total Volume(s)
2
-
País
-
Região
-
Data de divulgação
2012/11/14
-
Disclosure Status
Disclosed
-
Nome do documento
Data sheet
-
Palavras-chave
safeguard policy;Safeguard Policies;urban service;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.