Philippines - Methane Recovery from Waste Management Project : environmental assessment : Safeguards framework manual (Inglês)

The objective of the Methane Recovery from Waste Management Project for Philippines is to support environmental protection and promote sustainable development, while mitigating carbon credit risks, e.g., under-delivery of carbon credits, and other risks arising from different types of operational non-compliance. Negative measures include: waste management, noise, dust, odor, and water pollution. Mitigation measures include: a) sprinkling of water shall be conducted as often as necessary in dry and loose soil areas. Construction activities shall be controlled to avoid excessive generation of dust; b) the solid wastes shall be placed in the Materials Recovery Facility (MRF) component of the Sanitary Landfill (SLF) for proper segregation. The recyclable wastes shall be recovered and shall be sold to junk buyers; c) workers assigned in noisy areas should wear appropriate protective equipment particularly earplugs. Heavy equipment shall have noise reduction devices and shall be operated systematically; and d) maintenance of the SLF and the gas collection pipes shall be regularly conducted.

Detalhes

  • Data do documento

    2009/11/03

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E2285

  • Nº do volume

    1

  • Total Volume(s)

    2

  • País

    Filipinas,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2010/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Safeguards framework manual

  • Palavras-chave

    land use conversion;project design and implementation;emergency response plan;aquatic flora and fauna;negative environmental impact;acquisition of asset;Environmental Assessment;environmental due diligence;source of income;source income;land and housing;land use plan;environmental protection regulation;disposal of waste;pollution control devices;construction and operation;claim for compensation;Solid Waste Management;statement of work;payment of compensation;risk of accident;procurement of equipment;costs of transaction;court of law;international standards organization;environmental safeguard;replacement cost;construction phase;fish pens;contiguous area;physical environment;biological environment;political environment;tax declaration;fixed asset;physical implementation;interagency coordination;legal framework;project construction;public hearing;environmental law;Fixed Assets;documentary requirement;Public Utilities;affected persons;environmental aspect;agricultural land;environmental monitoring;legal right;applicable law;environmental risk;industrial park;economic zone;Environmental Policy;project finance;environmental compliance;initial loan;working day;market price;living standard;policy requirement;operational staff;budgetary allocation;procedural standards;environmental measure;collected data;minimum requirement;customary law;fishing ground;impact monitoring;environmental screening;perennial crop;moveable asset;investment operation;draft form;institutional responsibilities;environmental regulatory;processing fee;land acquisition;land reserve;public place;local ngo;cash payment;Waste Material;productive asset;indigenous community;environmental procedures;building material;impact area;salvage material;historical site;acronym introduction;institutional framework;affected communities;private asset;community well;indigenous communities;traditional rights;displaced person;ancestral land;income loss;political institution;cultural trait;principal source;market stall;legal title;indigenous religion;monitor compliance;project impact;food subsidies;communal forest;business loss;tourist spots;environmental data;primary purpose;social safeguard;financial intermediaries;institutional mechanism;environmental standard;oversight function;volcanic activity;threatened species;cultural community;natural calamity;iso 14001;wildlife preserves;wastewater treatment;involuntary resettlement;qualified professional;basic requirement;agency review;Indigenous Peoples;environmental infrastructure;procuring entity;environmental directive;health hazard;management scheme;biological resource;effluent standard;rural area;water quality;floor area;environmental benefit;loan client;environmental initiative;raw material;natural habitat;environmental requirement;energy balance;production capacity;water bodies;recharge area;site assessment;engineering design;technical expertise;qualification criteria;local infrastructure;private operator;income restoration;residential land;grievance procedure;cash assistance;site clearing;ecological effect;Water 3;marine biology;carbon finance;burial grounds;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.