The development objective of the Zhejiang Qiandao Lake and Xin'an River Basin Water Resources and Ecological Environment Protection Project for China is to demonstrate integrated pollution and watershed management and increase access to improved water supply in selected landscapes in support of the Government Qiandao lake and Xin’an river basin protection program. Some of the negative impacts and mitigation measures include: (1) strict requirements of the construction team in accordance with environmental protection requirements to discharge construction wastewater, regular cleaning of construction waste, and daily cleaning of construction waste; (2) carry out environmental management plan strictly according to environmental impact report; (3) top soil will be concentrated and backfilled in the process of temporary land occupation; (4) negotiate grave removal procedures with affected households; and (5) strict requirements, the construction party will be built within the specified time, night construction is strictly prohibited, put an end to the construction behavior which will affect the daily life of farmers.
Detalhes
-
Autor
-
Data do documento
2017/12/16
-
TIpo de documento
Plano de reassentamento
-
No. do relatório
SFG3880
-
Nº do volume
3
-
Total Volume(s)
3
-
País
-
Região
-
Data de divulgação
2018/02/05
-
Disclosure Status
Disclosed
-
Nome do documento
Resettlement action plan : Jiande and Chun'an
-
Palavras-chave
sewage treatment plant;land acquisition;land occupation;Land Acquisition and Resettlement;market value of land;Soil and Water Conservation;disease prevention and control;average annual output;standard of living;Resettlement Policy Framework;grievance redress mechanism;total water supply;planning and design;place of residence;access to asset;loss of income;method of valuation;social security system;rural drinking water;water supply system;public opinion survey;payment of compensation;number of women;laws and regulation;public participation process;resettlement and rehabilitation;water quality improvement;impact of land;water supply pipeline;control of pests;institutional capacity building;water supply service;impact of road;cost of transport;sources of fund;acquisition of land;loss of asset;income earning potential;pipe network;displaced person;small watershed;resettlement impacts;arable land;water work;forest land;legal right;affected persons;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.