Skip to Main Navigation

Tajikistan - Additional Financing for the Ferghana Valley Water Resources Management Project (Inglês)

Detalhes

  • Data do documento

    2010/04/02

  • TIpo de documento

    Documento de informações do projeto

  • No. do relatório

    AB5509

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Tajiquistão,

  • Região

    Europa e Ásia Central,

  • Data de divulgação

    2010/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Tajikistan - Additional Financing for the Ferghana Valley Water Resources Management Project

  • Palavras-chave

    irrigation and drainage;land and water management;scheme will;Environmental and Social Impact;access to irrigation water;additional water;dam;gross domestic product;beneficiary rural community;environmental management framework;quality and quantity;cost of electricity;early warning system;cost of work;water user association;agriculture and irrigation;global financial crisis;land use right;aral sea basin;water irrigation;water for irrigation;high value crops;food security crisis;loss of employment;portfolio of investment;rapid social assessment;power and water;water user organization;combination of factor;international experiences show;irrigation water delivery;sustainable land management;cost of vehicle;physical cultural resources;rehabilitation of infrastructure;water management activities;consumers of electricity;groundwater level;risk profile;natural habitat;pumping station;power system;income shock;irrigated area;Irrigated Agriculture;dam safety;pump station;dam failure;riparian country;agricultural land;drainage system;cross border;agricultural production;involuntary resettlement;gravity irrigation;soil loss;financial sustainability;improved water;water fee;vegetative cover;irrigation technologies;dust generation;water quality;yearly budget;cultural property;public consultation;extension program;land acquisition;local resident;water volume;long-term sustainability;basin level;Safeguard Policies;physical infrastructure;operational improvement;limited resources;local population;dam stability;civil works;irrigation canal;project impact;management function;benefit analysis;water abstraction;power supply;rehabilitation need;capital asset;infrastructure system;Power Generation;observation well;water source;crop production;Indigenous Peoples;agricultural output;farm income;lessons learnt;safeguard policy;hard currency;rural area;water reserve;large pumping;budget resource;energy liberalization;electricity sector;financial viability;cotton area;heavily dependent;family farm;land records;soil fertility;large dam;crop yield;water control;migrant worker;construction industry;remittance income;Rural Poor;agricultural area;climatic condition;low-income household;flood protection;fixed equipment;hydropower generation;environmental mitigation;farm productivity;project sustainability;direct investment;emergency procedure;central command;beneficiary country;small Works;cash crop;concrete work;cereal crop;pasture land;agrarian society;limited capacity;local farmer;poverty alleviation;irrigation network;institutional analysis;collector drains;drainage canal;flood level;agricultural productivity;computer equipment;aide memoire;safe operation;reservoir volume;Institutional Sustainability;fiduciary responsibility;International Water;international expert;train activity;international waterway;contract management;notification requirement;financing source;social scientist;financial cost;management capacity;financial audits;procurement review;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.