Detalhes
-
Autor
-
Data do documento
2020/12/27
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR43373
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/12/27
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Central Asia South Asia Electricity Transmission and Trade Project (CASA-1000) - P145054 - Sequence No : 13
-
Palavras-chave
transmission line; corridor of impact; citizen engagement; operations manual; emergency preparedness plan; Investment Project Financing; high voltage transmission; electricity trade; commercial framework; operation risk; risk category; joint mission; trade guarantees; social audit; beneficiary feedback; project agreements; institutional mechanism; project sustainability; benefit sharing; construction phase; participatory planning; participatory monitoring; community support; sustainable electricity; contractual arrangement; mitigation measure; electric grid; planning activity; acceptance tests; creative solution
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.