The development objective of the Chongqing New Urbanization Pilot and Demonstration Project for China is to improve use of public space and increase pedestrian mobility in selected districts of Chongqing’s Central city. Some of the negative impacts and mitigation measures include: (1) due to a pretty large noise produced during the construction process, reasonable noise isolation and reduction measures shall be taken during the project design to mitigate the impact of construction noise on the field construction workers; (2) each park and footpath system design shall be further optimized, try to balance excavation and filling, reduce work quantity of excavation and filling, reduce surface vegetation damage, and reduce new water and soil loss; (3) before the construction, the mellow soil of the topsoil layer in the area of the acquired land should be stripped, piled up at fixed points, and covered with waterproof membrane; (4) the construction method and time should be planned well to reduce the disturbance of the construction noise to the wild animals; (5) some existing roads within the project area will be used to transport construction materials, earth, and stone during project construction, and attention should be paid to the appropriate arrangement of the construction material transportation time; (6) sanitary sewage is strictly forbidden to be discharged directly into the natural water body; and (7) the management of construction machines should be strengthened to prevent moving, false use, dripping, and leaking of the machines.
Detalhes
-
Autor
CCTEG Chongqing Engineering
-
Data do documento
2018/05/01
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
SFG4340
-
Nº do volume
1
-
Total Volume(s)
3
-
País
-
Região
-
Data de divulgação
2018/06/28
-
Disclosure Status
Disclosed
-
Nome do documento
Environmental and social management plan for Jiulongpo district component
-
Palavras-chave
Soil and Water Conservation; environmental environmental; Environmental Management Plan; assessment district; construction phase; Environmental and Social Performance; cultural relic; comprehensive environmental impact assessment; environmental and social management; mitigation measure; environmental monitoring; environmental protection measures; law and regulation; state forestry administration; college entrance examination; finished product; road pavement; project construction; transportation at night; code of conduct; construction and operation; inspection of construction; environment protection plan; environmental impact mitigation; comprehensive pollution control; local waste collection; sewage treatment plant; wastewater treatment system; environment impact assessment; planning and design; land administration law; national forest; regular waste collection; physical cultural resources; storm water management; terrestrial wild animal; transportation of waste; environmental quality monitoring; environmental protection systems; independent management; protection of animal; implementation of mitigation; supervisory environment; environmental noise pollution; natural water bodies; solid waste treatment; safeguard policy; construction site; Safeguard Policies; environmental supervision; soil loss; legal framework; administrative measure; public space; construction machine; garbage collection; environmental issue
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.