Detalhes
-
Data do documento
2009/05/07
-
TIpo de documento
Documento de informações do projeto
-
No. do relatório
AB4566
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2009/06/02
-
Disclosure Status
Disclosed
-
Nome do documento
India - Fifth Power System Development Project
-
Palavras-chave
transmission system;transmission and distribution network;transmission network;external current account deficit;Safeguard Policies;financial crisis;transmission line;generation capacity;safeguard policy;additional hydro capacity;potential regulatory change;power sector restructuring;national power grid;credit rating agencies;damage to natural;geographical information system;social safeguard policy;foreign exchange rate;national grid system;thermal power plant;efficiency and quality;international financial institution;high voltage transmission;credit rating agency;operation and management;Access to Electricity;per capita consumption;national transmission system;inclusive economic growth;Access to Energy;global financial crisis;domestic credit market;electricity distribution system;rural electrification program;domestic coal resource;electricity transmission company;domestic energy source;sound financial position;domestic capital market;rural area;deficit region;bulk power;regional transmission;investment program;energy security;financial instrument;social policy;maximum extent;social policies;distributed generation;affordable price;national legislation;processing time;expansionary policy;Financial Sector;satellite imagery;technological innovation;green area;institutional strengthening;international waterway;loan transaction;bank product;public consultation;competitive bidding;financial analyst;power line;financial situation;technical expertise;capacity enhancement;generation mix;generation plant;nuclear plant;construction work;market condition;efficient operation;power utility;increased trading;generation dispatch;transmission expansion;adequate transmission;commercial efficiency;power utilities;open access;external credit;long-term sustainability;cleaner energy;coal plant;energy production;development partner;creative solution;infrastructure financing;domestic financing;financing plan;Financing plans;long-term financing;cost of energy production;transmission investment;bond issue;power exchange;conventional procurement;Procurement Policy;industrial production;heavy reliance;commercial operation;cleaner coal;governance practice;transmission function;international level;electricity access;internal resources;private investor;installed capacity;hydro development;hydro potential;Small Hydro;stock market;power shortage;regional cooperation;sectoral regulation;energy resource;short period;funding source;electricity service;energy deficit;domestic investor;risk capital;direct loan;transmission capacity;efficiency issue;transmission utility;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.